We had a short time frame in which to do our first phase of our home remodel.  The home really needed cleaning, paint and more modern feel.  We knew going into this that there was no way we would have the time or money to remodel the entire home so while we were mid-negotiation and mid-purchase we sat down and thought about what we could do in just one month to the home.  That being said, we did an incredible amount of work on the home in a very short time period.  We decided to focus almost entirely on inside at first given we had to live in it, though we did a few outdoor things out of necessity.  This post is long overdue and the work was earlier this year.  Most of the photos of the rooms were taken close to when we moved in so I will post later photos as I post more.

We didn't sleep much.  We didn't do all the work ourselves but we sure did a lot of it.  We started the day we closed on the home and within a couple of days were were in full force remodel mode.  There weren't really any days where I didn't make the drive to the property to work or to manage contractors.  We did the demo ourselves almost completely.  We didn't get any rest for almost 6 weeks from purchase to move.  We were so tired after remodeling and the move and some light unpacking that we didn't do anything on the house for several weeks, we just went to work and lazed around and slept!  

The home had popcorn ceilings throughout the house aside from the kitchen.  The walls were knockdown style texture but over the 35 years of the life of the home, the previous owners had patched holes, some big, some small, most of the patches were very easy to see.  Knockdown isn't the easiest to patch and we would have to re-texture the majority of the home to fix the patches so we decided to have the walls skim coated and then textured with imperfect smooth.  Imperfect smooth is very popular in the newer homes in California and I prefer the look to the knockdown style.  It's easier to patch to boot.  I have to say, it turned out pretty freaking amazing.  We love the new texture and the new look.  Getting rid of the popcorn ceilings made a huge impact on the home.  

Here are the examples that I gave our drywall contractors. 



One of the things that dated the home the most was all the dark wood.  The cabinets, baseboard, doors, and casings were all brown and we hated it.  The home also had wood ceilings in the great room and a wood accent wall in one of the small bedrooms.  We decided that we wanted all of it sanded and painted and even though we love color we decided we were going to paint the entire home Kelly Moore Swiss Coffee white.  The home was dark and we really wanted to start out with bright white rooms before we started to go with colors.  We also decided we wanted to do an industrial/reclaimed but with clean lines and a craftsman look and this white would work well with our plans.

Between the popcorn ceiling removal, new wall and ceiling texture and fresh paint on all the walls, ceilings, doors, casing and such the home really looked great!  We ended up removing all the baseboard before they textured as we planned to go with craftsman style later anyway. 

I already mentioned that the home was dark and closed up and it felt like a maze of rooms.  This was a huge problem for me.  It's a ranch and the front door entered into a hallway.  The home was chopped up and very closed.  I prefer the open feel and without a plan to open this up I couldn't see how we could make the home ours.  Luckily, my wife Jodi and her brother, Tim and sister-in-law, Marty had some great ideas as to how to make the home so much better.   There was a closed dining room right in the middle of the home and they suggested we remove the walls and put in two large 6 x 6 wood posts in place of the walls.   The water heater was in the middle of the home in a closet and needed to be moved to the garage. To be honest, I knew it would be better but it was very hard to picture it until the walls started coming down.  The side walls were not support walls so we removed those first.  We removed the pipes, drywall and everything else form the support wall.  We dug 18" holes under where the poles would be in the crawl space to prepare for piers.  Tim put in piers and let them set for a week and then came back and built a temporary wall, put in a new header and then the new posts.  What a difference.  This house would not be the same without Tim having done this project for us.  Tim crawling out of the floor from working under the home.


Going back to the problem of the home being dark, we knew a chunk of our budget had to go to electrical work.  The house had light switches everywhere and half of them seemed to control nothing. Some controlled outlets because the home was never outfitted with bedroom lights.  I couldn't see spending hundreds of dollars on floor lamps and such.  It's inefficient and I don't like the way it lights a room.  We wanted every bedroom to have a ceiling light and light switch.  There was white but yellowed track lighting (the kind from 1988) in the kitchen.  The large living room had a single ceiling fan with dim lights that barely lit the room despite the slider and larger windows.  

We love recessed can lights and decided we would have 30 can lights installed with LED bulbs and modern white bezels.  We ripped out every light in the house (there were only 9!) and installed 30 lights in their place, with the intention of hanging two more ceiling fans, one chandelier, one mini chandelier and two bathroom lights.  Wow what a difference it made!  We are still working on the lighting but with the recessed lights being done it was incredible.  We also had to have the electrician we hired hookup our spa, install new bathroom fans and many 3way and 4way switches.  He pretty much lived at the house for two weeks.  The lights look amazing.  Jodi's brother, Tim, is very talented at lighting layouts and esthetics and without him guiding the process I am sure we wouldn't have been as happy with the results.  He helped the electrician lay them out in beautiful and yet practical ways.

We also decided to rip out the exposed wood burning stove that was in the main living room.  It just wasn't my thing and our plans for the room wouldn't work with it there.  It also dated the home because of the way it was built so removing it was another part of modernizing it.  It was an incredible amount of work to bust up the brick on the wall and it was a huge mess.

Here is my nephew Blake showing off the death stick hammer that he was using to help tear up the wall with earlier.  This kid loves to destroy things!



The home was all electric appliances, the water heater, furnace, stove top, everything was electric.  We put a chunk of our budget towards installing propane on the property and then Tim installed a new high efficiency hot water heater.  We didn't want to spend $2,000 on a new cook-top because we want to do a full kitchen remodel (like gut the entire thing) in the next several years so we shopped on Craigslist and found a used Jenn-Air gas cook-top in white that was already converted to propane.  $100 later and we had a gas cook-top instead of the electric one.  I have never cooked on electric aside from the first few weeks we lived here and I don't care for it so I was happy to change it!  Given the work under the home, we removed all the duct work because it was old, dirty and gross and beat up to boot.  The old electric furnace was ripped out (it was held together with duct tape :) and was replaced by a new high-efficiency propane model.  

The only thing we needed to do with the yard had to do with our hot tub we were moving with us.  We love it.  We need it.  We certainly need it while remodeling a home over the next few years!  We hired a local guy, Pedro, and he tore out the fence and built a small new section of it to make sure the back yard was still closed off.  It opened up the small barn or large shed, not sure what to call it, so that it was in the fenced in backyard and so that we could have a concrete patio poured for the hot tub.  Eventually we plan to fence in much more of the yard and open up the backyard even more but that's for another day.

We had to rip out the deck off of the master bedroom and replace it because it was rotten.  We also had to dismantle part of the other deck and the front porch and repair them as they were pretty bad.  Luckily we saved them enough to get by until we rip them out in the next few years.  We had some minor dry rot in some areas that Tim replaced on the home.  

I feel like I'm missing some stuff but man... I feel exhausted just revisiting the list of everything we did to this house in that short period of time.  We learned a lot.  We had lots of successes and some mistakes along the way.  Mostly, we learned a lot about hiring contractors.  If you find good quality, hard-working and honest contractors, electrician, plumber, drywall and texture people, painter, etc., hold them near and dear.   They are not always easy to find and a bad contractor makes for a very stressful and expensive project.  

Let's start with some before pictures.  I took these when we went through the house originally and then again right before we put in the offer, some are just before the remodel.  

This was the living room/great room.  It was dark most of the time.  I love the wood ceiling but not in brown. 


We were really happy about how this room turned out.  We still have some work to do (like replacing those boards in the ceiling where we ripped out the wood burning stove, don't worry, the roof is repaired, that just goes into the attic).  I would like to do built ins in place of the entertainment cabinet.

 
 
The kitchen was closed off with a giant cabinet but they upgraded the appliances about four years previous to us moving in so while dated, there were some good qualities to work with in the kitchen that we knew would make it cheaper on the initial budget.


 
We called this the "ugly green room" until we removed all the walls and it was no longer an ugly green room. :)


Good-bye ugly green room!

 
The view from the kitchen into the old dining room, or ugly green room.


This front/formal living room will be a guest room.  We plan to add a distressed barn door to it, a ceiling fan, and many more details later.


It's also the room where we pile everything until we get our garage in order and move it out.  

Ah, the pink bathroom.  My grandmother would love it.  Blech.


We plan a full remodel of this bathroom in the near future.


We certainly have a lot left to work on but we are having fun doing it!

Next post will be about our closet remodel. 